The Brooklyn Greenway Initiative

Archives

Greenway E-News




Email Marketing by VerticalResponse


Interim Greenway Installed on Flushing Avenue

NYC DOT has extended its interim improvements for the greenway along Flushing Avenue from Williamsburg Street to Navy Street. It features a physically protected 2-way bikeway from Williamsburg Street West to Washington Avenue and new Class 2 bike lanes for the balance of the stretch.
 
Combined with previously created interim segments on Kent Avenue, Williamsburg Street West and Columbia Street, nearly 4 miles of the 14-mile greenway route have been created on an interim basis. In the meantime BGI continues to work with NYC DOT on the the master plan for the entire route.

New Flushing Ave interim greenway treatment installed this month by NYC DOT.

One thought on “Interim Greenway Installed on Flushing Avenue

  1. I ride the Flushing ave bikeway every day now on my way to work. I never liked riding beside all those parked cars, and traffic moved slow so you were stuck tight between stopped or slow traffic and parked cars. It felt too dangerous.

    Now Flushing Ave is a great route for me. Speedy and safer. I take Bedford to Flushing then over the Manhattan bridge. It’s a great route to work.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>